Saturday 4 January 2014

First Sketch of myself...ya I know...still have a lot for me to improve....

Friday 27 December 2013


The life of an architecture student have taught me an important lesson~ time management. Knowing the time to serious and knowing the time of resting.

The studio works requires team work is really a challenging lesson especially for me as the team leader, the skill of managing and communicating with people is really a big lesson. I mixed and worked with different people of different culture and different religion and this have encouraged the interaction among us.

I still have to improve my skill of sketching, drawing, colouring and even designing from the comments from my studiomaster, Dr. Mazran and also Ar. Haris. Thanks to them because I have learnt some skills like where to get the inspiration and also the idea of design from them.

Long way to go man, I tell myself and wish me and wish everyone good luck ! 


Project 8
LIVE PERFORMANCE

The Final Project of this sem~
( The Perfect End and also The Closing Ceremony of the First Semester )

Main Theme : The Lost Kingdom
The theme for us, architecture is based on the Empire of Srivijaya~
Our coursemate is very focusing on the costume design~

A treat from the studiomaster - Dr. Mazran
KFC !!!! THANK YOU !!!

RUS 104 LIVE PERFORMANCE & AWARDS NIGHT


Performance by us ~ the glaring and glowing hand clapping in the dark~

Here we go ~ We will meet each other next sem guy~





Project 7 

RUS 104 XZBITION 2013

IT is our self-organzed exhibition event~

Theme : Floating Line

We are required to share all of our project from project 1 until project 6 to be displayed durinf this exhibition~

Our Architecture Booth Banner ~

A part of Archi Family Photo of us~


Whole Archi Family Photo ( just I don't know why I'm not in the photo, in fact I also don't know when they all took this photo, hahaha )
Amphitheater Stage Model Making

Finally completed our presentation drawing of our amphitheater stage design, so is time to start our model already~ 

Two weeks time, 16 persons effort, plus overnight work~

And also the commitment of all of us and also the consultation of our studiomaster, Sr. Dr. Md Azree~

Here we go~


 Ladies and gentlemen~ Our Amphitheater Stage~ The Canyon !



 

Thursday 28 November 2013

Project 6
DESIGN & BUILD ‘AN AMPHITHEATRE STAGE’

In a group of 16 people, we are required to produce a single storey stage structure and amphitheatre (for ‘live performance’ function)

§  The design must consider the topography condition of the given site (next to the end of the HBP E08 Studio Block facing the Penang Bridge) and tropical climate of Malaysia which is characterized by heavy rain, intense sunshine, windless condition etc.
§  The permanent stage design must also be able to withstand loads (including wind load).
§  The maximum size of the stage is 4.0m (width), 6.0m (length) and 5.0m (height)
§  The main material of the stage is timber.
§  The stage design should consist of:
-          Roof / covered structure
-          Area for backdrops or LCD screen
-          Raised floor area for performance of not more than 24m2.
§  The amphitheatre seating area should accommodate 100 seats of people of several deck levels.




 

Sunday 10 November 2013

Not yet finish my project 5~
Come on~
Project 5b: Neighbourhood Elements: Proposed Improvement

I'm in love with this because I really like to think of the improvement about the planning and the facilities in the community~

Here we go~
As you can see from the top left corner there,it is the original plan layout ( NTS )
I have used the red pen to label it with a few place that need to be improved
  1.  There is 3 end roads in the community and cul-de-sac should be constructed to allow the turning of the vehicle and also the access of the fire truck in emergency
  2. The back lane view showed that the road level is not the same as the house level, and a staircase is used as the access to the back of each house, so the proposal will be the road level should be as the same as the house level and this also comply the fire department requirement.
  3. The drainage system in front of the house should be covered up to provide a pedestrian walkway and ramp should be constructed for the convenient of disable group
  4. Side lane should be constructed beside every end lot unit for better traffic circulation and allow the access of fire fighting truck during emergency.
  5. Planter box and full plating been proposed at the first service road to isolate the service road from the state road to reduce noise disturbance and air pollution and this will directly beatify the surrounding environment also.
  6. The location of the sewarage treatment plant and TNB sub-station and PBA pump house is not suitable as nearby the residential house. The site should be proposed to be a small recreational park.
  7. The original recreational park at the end of the community should be modify.


Modification and Imagination of new recreational park~